Align front edges and top planes
Put the project and revision on the document, use consistent cabinet references and make superseded versions unmistakable. The drawing is a controlled release, not an informal snapshot.
Cabinets should be clamped flush, checked for level and plumb, then joined through suitable structural points without distorting the boxes.
Cabinets should be clamped flush, checked for level and plumb, then joined through suitable structural points without distorting the boxes.
Joining must align the cabinet faces without pulling distorted boxes into a false position.
Level and square each cabinet first, clamp through protected faces, pre-drill where required and join at structurally appropriate points.
A straight, stable cabinet run with controlled gaps and no induced twist.
Each check below is tied to the subject of this page. Record the input, the decision and the evidence used to approve it.
Put the project and revision on the document, use consistent cabinet references and make superseded versions unmistakable. The drawing is a controlled release, not an informal snapshot.
Turn this point into a recorded decision: define the input, review it against the real project and keep the evidence that allows another person to verify the result.
Turn this point into a recorded decision: define the input, review it against the real project and keep the evidence that allows another person to verify the result.
Verify the building condition and the fixing method before positioning the cabinet. Establish one reference, support the box without twisting it and recheck after connection.
Joining screws should not be used to pull badly levelled cabinets into position.
Start with Align front edges and top planes. Then verify Protect finished surfaces while clamping and Use the correct connector or screw length. Close the review with Recheck diagonals and door gaps after joining and keep the approval evidence with the project revision.
DesignPro supports planning and organised project information according to the selected package. Final material, hardware, production, fixing and site decisions remain subject to project-specific verification.
Use the DesignPro project as a common reference for the people who measure, price, supply, cut, assemble or install the work. Keep the final approved inputs with the released output.
A straight, stable cabinet run with controlled gaps and no induced twist.
Final plan, cabinet sequence, wall and floor survey, fixing information, service locations, tools and the relevant hardware instructions.
Joining screws should not be used to pull badly levelled cabinets into position.
DesignPro supports planning and organised project information according to the selected package. Final material, hardware, production, fixing and site decisions remain subject to project-specific verification.